Alderwood Washington Reservoirs Start Date 2019 End Date 2020 Location Alderwood, Washington Owner Alderwood Water & Wastewater District (AWWD) Project Description The project, performed for Alderwood Water & Wastewater District (AWWD), consisted of a full Rehabilitation and Repairs on two of their Reservoir Tanks. The tanks were both 370’...
Read MoreChesapeake Bay Bridge and Tunnel Project Start Date 01.01.2012 Project End Date 07.01.2013 Location Chesapeake Bay Bridge and Tunnel, VA Owner: CBBT Project Description Saffo was awarded the project in 2014 for the painting of the tunnel ventilation system at the Chesapeake Bay and Bridge Tunnel District. This included...
Read MoreCollege Hill Water Tank Project Start Date 06.07.2021 Project End Date 09.01.2021 Location Lynchburg, VA Project Description The project consisted of the rehabilitation of 5 reservoirs in Lynchburg, VA. The largest of the reservoirs was the College Hill Reservoir, a 10.5-million-gallon tank that was 240’ in diameter. Saffo performed...
Read MoreNCDOT Triangle Expressway Coatings Removal Project Start Date 05.01.2020 Project End Date 05.01.2021 Location Raleigh, NC Owner NCDOT Project Description The Project consisted of abrasive blast cleaning over 400k sqft of existing concrete staining to an SSPC-SP13/NACE-6 utilizing expendable media with ERI injection repairs to Concrete Columns & Bridge...
Read MoreThe Old Seven Mile Bridge Project Start Date 10.01.2017 Project End Date 10.25.2021 Location Florida Keys, FL Project Description The Old Seven, as it is nicknamed, stands out in the Keys for two reasons — its history (it was once called the Eighth Wonder of the World) and the...
Read MoreRDU International Airport Project Start Date 09.01.2019 Project End Date 04.27.2020 Location Raleigh, NC Project Description Saffo Contractors was hired and tasked with removing over 2.5 million square feet of coating failure to the roof of all 7 levels of the RDU Central Parking Garage. RDU International Airport services...
Read MoreRainbow Bridge, Texas Project Starting Date 01.01.2015 Owner TXDOT Project End 05.01.2017 Project Description About the Bridge: The Rainbow Bridge in Texas is spans the shores of the Neches River. It was completed in 1938 and is the tallest bridge on the Gulf Coast. It rises to a height of a...
Read MoreRockbridge Twin Bridges Project Start Date 03.19.2021 Project End Date 11.22.2021 Location Lexington, VA Owner VDOT Project Description The I-64 Maury River Twin Bridges are delta frame bridges that were built in 1976. Saffo Contractors was awarded the project in 2021 to clean and paint both structures utilizing an...
Read MorePNG Absorption Tanks Project Start Date 01.01.2020 Project End Date 03.01.2020 Location PNG Peak Shaver Facility Maxton, NC Project Description Saffo Contractors were hired to surface prep and paint the interior and exterior of 3 Absorption tanks at the Maxton, NC Peak Shaver Facility. Saffo first erected scaffold access...
Read MoreChesapeake Bay Bridge Tunnel Project Start Date 04.17.2014 Project End Date 04.16.2016 Location Chesapeake Bay Bridge and Tunnel, VA Project Description The Chesapeake Bay Bridge-Tunnel Commission awarded the project to paint its tunnel ventilation systems to Saffo Contractors, Inc. of Wilmington, NC. This project generally consisted of existing paint...
Read More