SSPC Certified QP1 & QP2 Contractors

SAFFO PROJECTS

Home SAFFO PROJECTS

Alderwood Washington Reservoirs

Project Description

The project, performed for Alderwood Water & Wastewater District (AWWD), consisted of a full Rehabilitation and Repairs on two of their Reservoir Tanks. The tanks were both 370’ in diameter with capacities of 28 and 20 million gallons respectively. The project consisted of surface preparation and painting on over 300,000 square feet of structural steel utilizing a high moisture coating system (Zinc, Epoxy, Urethane). In addition to surface prep and painting, Saffo performed welding and tank apparatus replacement repairs.