PNG Peak Shaver Facility Maxton, NC
Saffo Contractors were hired to surface prep and paint the interior and exterior of 3 Absorption tanks at the Maxton, NC Peak Shaver Facility. Saffo first erected scaffold access and containment systems utilizing imperviable tarps to facilitate abrasive blasting and coating applications. Saffo surface prepped the exterior and interior of the tanks to an SSPC-SP 10 (Near White) utilizing recyclable steel grit and ADI Recycler Unit. Saffo then applied a prime coat of Inorganic Zinc & a topcoat High-Temperature Amine-Cured Novolac Epoxy. Saffo also supplied confined space permits and safety equipment according to OSHA and site safety regulations.
Piedmont Natural Gas