05.01.2020
05.01.2021
Raleigh, NC
NCDOT
The Project consisted of abrasive blast cleaning over 400k sqft of existing concrete staining to an SSPC-SP13/NACE-6 utilizing expendable media with ERI injection repairs to Concrete Columns & Bridge Structures. Scaffolding systems were erected by Saffo to provide work access to the sign columns and other structures. This project stretched over 14 miles on the NC 540 Toll Highway from Durham, NC to Apex, NC.